Service TypeScan To BIM
Building TypeUtility Plant
Discipline/TradeMEPF
LOD300
Area4.75 Lakhs sq.ft
LOA3/4"
ScopeTo create latest drawings of the plant
TAT40 Working Days

Scan + Navisworks + Record Drawings + Site Images = Final BIM Model

Key Challenges
  1. 7000+ hours of work in just 5 weeks.
  2. 20+ MEPF services that weren’t recognized from the point cloud.
  3. The final BIM model wasn’t just from scans but it combined record drawings, Navisworks models, SLDs, and a lot of assumptions.
Key Deliverables
  • Detailed BIM Model
  • Mark Ups with changes of model
  • GFCs

🔄 Project Workflow (How project work goes)

Scan to BIM

Scan + Record Drawings (PDF) to BIM

Scan + Record Drawings (PDF) + Navisworks (NWD) to BIM

Most Recent Record Drawings Updates

Creating As-Built Drawings

Markups in As-Built Drawings

20+ Utilities, Process Piping, Medical Piping, MEPF Services Modeling

Underground Piping Modeling with Design Updates

Roof Modeling from satellite images

Update Final Modeling from Site Images

📌 Key Sections We cover:

• Project Scope & Work Breakdown Structure
• How Scan to BIM evolved to modeling from multiple data sources
• Automating Scan to BIM Modeling and QA/QC
• Solutions for common pain points in Scan to BIM projects
• How I Steered the Ship, and much more…